New property and handover inspections
At handover, owners must notify developers of defects within the contractual deadline. Inspectors comprehensively examine the unit and consolidate issues into a defect list.
Man Kee Engineering Company
First-hand, pre-sale, existing and older properties, and renovation inspections
Man Kee Engineering CompanyWe inspect new and existing properties for Hong Kong owners. Our inspectors are trained by government-registered engineers and building surveyors, who prepare our reports. We are appointed by major developers and have inspected over a thousand units.
Using a range of tools, we identify defects carefully and compile illustrated lists for developers or contractors. We serve every client with commitment, care, professionalism and focus.
Inspection fees:HK$3/sq ft for units over 800 sq ft, minimum HK$1,500, including re-inspection
Inspection types
Objectives vary, so inspectors adjust their priorities to the property type:
At handover, owners must notify developers of defects within the contractual deadline. Inspectors comprehensively examine the unit and consolidate issues into a defect list.
Handover inspections apply to completed first-hand and pre-sale units. Arrange one after receiving the keys and before furnishing or renovating, to distinguish original workmanship issues from subsequent damage.
These assess actual condition, including seepage, hollow areas, plumbing and electrical systems, helping buyers budget for repairs and renovation.
Older buildings often have ceiling and wall seepage, concrete spalling, ageing pipes and leaking window frames. Inspectors use infrared scans and moisture meters; further investigation may includeLeak source detection。
After renovation and before final payment, an independent inspector checks masonry, paint, joinery, doors, windows, plumbing and electrical workmanship, listing defects for the contractor.
After rectification, the inspector returns to verify each item. Re-inspection is included in our fee.
Service scope
Living and dining rooms, master and guest bedrooms, helpers' rooms, bathrooms, kitchens, storerooms, balconies and external walls.
Ceilings, cornices, walls, floors, skirtings, doors, windows, sills, mirrors, cabinets, glass, toilets, baths, basins, sanitary fittings, towel rails, shower curtain rails, toilet-roll holders, worktops, water supply, drainage and railings.
Doorbells, intercoms, switches, lights, air conditioners, heaters, cooker hoods, extractor fans, refrigerators, washing machines, dryers, hobs, microwaves, ovens, gas water heaters, television sockets and telephone outlets.
Inspectors explain defects throughout the property and photograph each item.
An illustrated professional defect list is supplied after inspection.
Inspection tools
Technicians select tools according to the property's conditions:
Testing methods
Methods include, but are not limited to, the following, selected as appropriate:
Inspectors examine finishes, joints, edges and installations for visible cracks, colour differences, scratches, chipped corners and misalignment.
Infrared equipment measures temperature distributions on walls, ceilings and floors to identify possible dampness without damaging finishes. The principle is the same asInfrared leak detection.
A hammer or hollow-area probe is used to tap walls and floors and assess bonding by sound. Hollow areas may later detach or crack and are marked in the report.
Moisture meters corroborate suspicious thermal imaging findings, particularly around windows, bathrooms and kitchen walls.
Running water tests check taps, toilets, basins, baths and floor drains for proper flow and leakage.
Inspection priorities
These locations frequently reveal defects. Each property differs; findings depend on the on-site inspection:
Cracked plaster, uneven or blistering paint, uneven walls and misaligned cornice joints.
Uneven, scratched or hollow floors, excessive timber floor gaps and loose skirtings.
Poor operation, loose locks or hinges, scratched glass, inadequate seals or seepage around windows.
Hollow or chipped tiles, slow drainage, unstable sanitary fittings or cabinet doors, and leaking joints.
Faulty switches or sockets, inoperative lights or supplied appliances, and faulty doorbells or intercoms.
Loose railings, blocked drains and damaged external finishes.
Inspection process
Property inspection reports
An illustrated defect list identifies issues and locations for the developer or contractor to rectify. Our reports are prepared by building surveyors.
These are different names for the same document listing the defects found during an inspection.
OurSample inspection reportspage contains previous report PDFs so clients can review the format and detail before booking.
Inspection fees
HK$3 per square foot per visit for units over 800 sq ft, minimum HK$1,500, including re-inspection.
For units below 800 sq ft, please call for a quotation.
Please call now 92703423 / 68186286 Book an inspector
Request an inspection quotation online | Fees and re-inspection FAQs
Preparing for an inspection
For further handover questions, seeNew property handover FAQs。
Inspection company
All inspectors receive professional training. For our team and qualifications, seeOur organisation and professional inspection team。
Illustrated defect lists help contractors identify and address each issue.
We have inspected more than a thousand units. For company background, seeAbout Man Kee Engineering。
Re-inspection after rectification is included in the inspection fee.
Owners comparing inspection companies and recommendations can reviewCustomer feedback after inspection。
Frequently asked questions
Our fee is HK$3 per square foot per visit for units over 800 sq ft, minimum HK$1,500, including re-inspection. Quotes depend on the floor area and property type. Call 92703423 or 68186286 for details.
We comprehensively inspect rooms, finishes, sanitary fittings, plumbing, appliances and electrical installations; select from over 30 tools; explain and photograph defects; provide an illustrated report; and re-inspect after repairs.
As soon as possible, before furnishing or renovation, to distinguish original defects from later damage. Developer rectification deadlines depend on your agreement.
Depending on conditions, methods include professional visual examination, high-resolution infrared scans, hammer sounding, high-sensitivity moisture measurements and water tests.
It is an illustrated defect or snagging list identifying each issue and its location. Prepared by a building surveyor, it can be sent directly to the developer or contractor.
After repairs, the inspector checks each item against the defect list. Our fee includes re-inspection.
Yes. We provide acceptance inspections for new and existing properties, including older buildings and completed renovations.
Signs are recorded in the defect list. If the source requires further investigation, thermal imaging, moisture meters and other tests can be arranged, with a leakage report as required.
Handover approaching? Book a professional inspector now
92703423
Man Kee provides new property, handover, first-hand, pre-sale, existing and older property inspections, renovation checks and re-inspections in Hong Kong. Please call 92703423 / 68186286, or visit theContact uspage to book. Our office is at Room A4, 17/F, Block A, Chungking Mansions, 40 Nathan Road, Tsim Sha Tsui, Kowloon.